MecklenburgCountyNC.gov
News
How Do I ...
Online Services
Public Records
Departments
Notify Me
 Code Enforcement:
About Us
Contact Us
Staff Directory
 Most Requested:
Code Interpretations
Electronic Services
Forms
Publications
Permit FAQs
Home Internet Permits
Inspection Failure Reports
Plan Review Failure Reports
Statistical Data
 Land Use &
 Environmental
 Services Agency
 Code Enforcement
 700 North Tryon Street
 Charlotte, NC 28202

 fax 704-336-3839

Racking Systems

Racking systems Quick links:

Examples of Racking system issues commonly found in the field - this contains pictures and explanations of commonly found issues with racking systems observed by field inspections.

Frequently Asked Questions

Plan Review and Field Inspection checklist items - this contains checklist items that are looked for in plan review and in the field on racking systems.

Example of how to complete the Appendix B as it relates to racking only - this contains highlighted areas of the Appendix B that are needed to be completed when submitting plans for review on racking systems.

Racking systems plan review and permitting guidelines:


The North Carolina Building Code requires that buildings and racking/shelving systems installed therein conform to seismic code requirements and other pertinent code requirements.  Based on the height of materials stored on shelving and the classifications of such materials, the North Carolina Fire Code classified certain installation "High Pile Combustible Storage".  To ensure code compliance and safety, the department reviews plans on such buildings and shelving systems prior to issuance of permits for construction.  Building projects of this type will follow one of the following 3 listed paths for plan approval and permitting.
 

  1. Full sealed plans submitted, reviewed and approved for the building and racking/shelving systems.  Permits are then issued for the building and racking/shelving system either together or separately.  Drawing must include the following:
    1. Appendix B
    2. A detailed list of the commodities and how they are stored
    3. Complete Sprinkler Drawings
    4. Hydraulic Design Criteria with a note indicating height to the top of materials stored and distance from top of stored materials to sprinkler heads
    5. Sealed drawing showing anchors in details or drawings and calculations if anchor details are not sealed in the plan submission for the project
    6. Egress/floor plan showing racking layout, exits and directional signage as needed to meet code compliance
    7. Special Inspections
  2. Plans submitted, reviewed and approved for the "shell" building with "upfit permits" issued at a later date.  The upfit permit may or may not include the racking/shelving permit.  Plans must be reviewed and approved prior to issuance of the upfit permits (which include their racking/shelving system).
    1. Appendix B
    2. A detailed list of the commodities and how they are stored
    3. Complete Sprinkler Drawings
    4. Hydraulic Design Criteria with a note indicating height to the top of materials stored and distance from top of stored materials to sprinkler heads
    5. Reflected ceiling plan
    6. Egress/floor plan showing racking layout, exits and directional signage as needed to meet code compliance
    7. Special Inspections        
  3. Racking/Shelving permit issued separately as a breakout from the upfit and require plans that include the following:
    1. Appendix B (may submit original field copy of approved upfit plans or submit Appendix B from the upfit permit drawings)
    2. A detailed list of the commodities and how they are stored
    3. Complete Sprinkler Drawings
    4. Hydraulic Design Criteria with a note indicating height to the top of materials stored and distance from top of stored materials to sprinkler heads
    5. Reflected Ceiling Plan
    6. Egress/floor plan showing racking layout, exits and directional signage as needed to meet code compliance
    7. For seismic, either provide sealed drawings with anchor details or provide anchorage calculations and drawings (if not sealed by NC registered engineer)
    8. Site Plan Vicinity Map
    9. Special Inspections
  • Existing Building - NOT a Change of Use and NOT classified Hazardous - Racking/Shelving permit issued separately.
    1. Appendix B
    2. A detailed list of the commodities and how they are stored
    3. Complete Sprinkler Drawings
    4. Hydraulic Design Criteria with a note indicating height to the top of materials stored and distance from top of stored materials to sprinkler heads.
    5. Sealed drawing showing anchors in detail or drawings and calculations if anchor details are not sealed in the plan submisison for the project
    6. Egress/floor plan showing racking layout, exits and directional signage as needed to meet code compliance
    7. Special Inspections (Field Verification) 
    1.  



      Printed from:

      on: