City of Charlotte Land Development Standards Manual (CLDSM) (Includes Charlotte ETJ)
Below are the City of Charlotte (and ETJ) Land Development Standard Drawings in PDF file format:
|
Adobe
|
Standard
|
Description
|
|
pdf
|
30.00
|
Special Erosion Control Requirements & Notes
|
|
pdf
|
30.01
|
Temporary Sediment Trap
|
|
pdf
|
30.02A
|
Skimmer Sediment Basin
|
|
pdf
|
30.02B
|
Skimmer
|
|
pdf
|
30.03A
|
Sediment Basin
|
|
pdf
|
30.03B
|
General Notes – Sediment Basins
|
|
pdf
|
30.04
|
Flexible Pipe Slope Drain
|
|
pdf
|
30.05
|
Temporary Silt Ditch
|
|
pdf
|
30.06A
|
Temporary Silt Fence
|
|
pdf
|
30.06B
|
High Hazard Temporary Silt Fence
|
|
pdf
|
30.07
|
Block and Gravel Stone Inlet Protection
|
|
pdf
|
30.08
|
Stone Inlet Protection
|
|
pdf
|
30.09
|
Hardware Cloth and Gravel Inlet Protection
|
|
pdf
|
30.10
|
Temporary Rock Check Dam
|
|
pdf
|
30.11A
|
Stabilized Construction Entrance
|
|
pdf
|
30.11B
|
Construction Entrance Tire Wash
|
|
pdf
|
30.12
|
Gravel and Rip Rap Filter Berm Basin
|
|
pdf
|
30.13
|
Erosion Control Dewatering
|
|
pdf
|
30.14
|
Temporary Stream Crossing
|
|
pdf
|
30.15
|
Catch Basin Inlet Protection
|
|
pdf
|
30.16
|
Slope Stability
|
|
pdf
|
30.17
|
Temporary Seeding Schedule
|
|
pdf
|
30.18
|
Construction within Creek Bank
|
|
pdf
|
30.19
|
Baffle Installation
|
|
pdf
|
30.20
|
Embankment Matting Detail
|
|
pdf
|
30.21
|
Brick Storm Structure with Temporary Pipe
|