Archived RFPs/RFQs - By Project
Items are "archived" when selections have been made or 60 days after their due date.

Please contact us with any questions/concerns about this page.
 
  
  
  
collapse Project : 2012 NBIS Bridge/Culvert Inspection Program and Non-Qualifying Bridge/Culvert Inspection Program (RFQ2011-52) ‎(4)
Ad_2012NBISBridgeCulvertInspectionProgram.pdfAdvertisement10/25/2011 5:00 PM
Add1_2012NBISBridgeCulvertInspectionProgram.pdfAddendum 110/25/2011 5:00 PM
Forms_2012NBISBridge-CulvertRFQ2011-52.docxForms A, B, C, D-1, & D-210/25/2011 5:00 PM
Selection_2012NBISBridgeCulvertInspectionProgram.pdfSelection Results10/25/2011 5:00 PM
collapse Project : 501 East Trade Street Surface Lot Management - FY2013 (RFP2012-39) ‎(7)
Ad_501EastTradeStreetSurfaceLotManagementFY2013.pdfAdvertisement1/10/2013 3:00 PM
Add1_501EastTradeStreetSurfaceLotMgt-FY2013.pdfAddendum 11/10/2013 3:00 PM
QA1_501EastTradeStreetSurfaceLotManagement.pdfQ&A No 11/10/2013 3:00 PM
Exhibit-ExpenseReport2011-501ETradeStSurfaceLotMgtFY2013.pdfExhibit: Expense Report 20111/10/2013 3:00 PM
Exhibit-ExpenseRpt2012-501ETradeStSurfaceLotMgt-FY2013.pdfExhibit: Expense Report 20121/10/2013 3:00 PM
Exhibit-ExpenseReport2013-501ETradeStSurfaceLotMgt-FY2013.pdfExhibit: Expense Report 20131/10/2013 3:00 PM
Selection_501EastTradeStreetSurfaceLotMgt-FY2013.pdfSelection1/10/2013 3:00 PM
collapse Project : Announcement of Upcoming Solicitation for Railroad Corridor Appraisal for the CATS Blue Line Extension (Preliminary) ‎(1)
Ad_RailroadCorridorAppraisalforCATSBlueLineExtension_Announcement.pdfAdvertisement10/15/2010 5:00 PM
collapse Project : Annual Topographic Mapping Program (RFQ2012-32) ‎(4)
Ad_AnnualTopoMappingPrgmRFQ 2012-32.pdfAdvertisement10/11/2012 5:00 PM
Add1_AnnualTopoMappingPrgrmRFP2012-32.pdfAddendum 110/11/2012 5:00 PM
Forms_AnnualTopoMappingPrgmRFQ 2012-32.docForms10/11/2012 5:00 PM
Selection_AnnualTopographicMappingPgmRFQ2012-32.pdfSelection10/11/2012 5:00 PM
collapse Project : Asbestos and Mold Abatement Services (RFP2011-16) ‎(4)
Ad_AsbestosandMoldAbatementServicesRFP2011-16.pdfAdvertisement8/26/2011 5:00 PM
Add1_AsbestosandMoldAbatementServicesRFP2011-16.pdfAddendum 18/26/2011 5:00 PM
Exhibit1_AsbestosandMoldAbatementServices.docExhibit 1 - Matrix8/26/2011 5:00 PM
Selection_AsbestosandMoldAbatementServicesRFP2011-16.pdfSelection Results8/26/2011 5:00 PM
collapse Project : Brownfield Assessments (RFP2010-24) ‎(7)
Ad_BrownfieldAssessmentsRFP2010-24.pdfAdvertisement7/14/2010 5:00 PM
Add1_BrownfieldAssessmentsRFP2010-24.pdfAddendum 17/14/2010 5:00 PM
DraftWorkPlan_BrownfieldAssessmentsRFP2010-24.pdfDraft EPA Cooperative Agreement Work Plan7/14/2010 5:00 PM
EPATermsConditions_BrownfieldAssessmentsRFP2010-24.pdfEPA Assessment Terms & Conditions7/14/2010 5:00 PM
Exhibit2_BrownfieldAssessmentsRFP2010-24.docExhibit 2 (Key Staff)7/14/2010 5:00 PM
Selection_BrownfieldAssessmentsRFP2010-24.pdfSelection7/14/2010 5:00 PM
Award_BrownfieldAssessmentsRFP2010-24.pdfAward7/14/2010 5:00 PM
collapse Project : Cemetery Grounds Maintenance - FY2013 (RFP2012-35) ‎(9)
Ad_CemeteryGroundsMaintenanceFY2013.pdfAdvertisement11/6/2012 3:00 PM
PreBid_CemeteryGroundsMaintenanceFY2013.pdfPre-Bid11/6/2012 3:00 PM
CemeteryGroundsMaintFY2010-EastElmwood.pdfExhibit: FY2010 Cemetery Grounds Maintenance - East Elmwood11/6/2012 3:00 PM
CemeteryGroundsMaintFY2010-Evergreen.pdfExhibit: FY2010 Cemetery Grounds Maintenance - Evergreen11/6/2012 3:00 PM
CemeteryGoundsMaintFY2010-WestElmwood.pdfExhibit: FY2010 Cemetery Grounds Maintenance - West Elmwood11/6/2012 3:00 PM
Landscape Construction Standards (Revi 5 Oct 2010).pdfLandscape Construction Standards11/6/2012 3:00 PM
SiteWalk-Thru_CemeteryGroundsMaintenanceFY2013.pdfSite Walk-Through11/6/2012 3:00 PM
Selection_CemeteryGroundsMaintenanceFY2013.pdfSelection11/5/2012 3:00 PM
Summary_CemeteryGroundsMaintFY2013.pdfSummary of Fees11/6/2012 3:00 PM
collapse Project : Cemetery Grounds Maintenance & Right-of-Way Mowing - FY2012 (RFP2011-44) ‎(8)
Ad_CemeteryGroundsMaintenanceandROWMowing.pdfAdvertisement12/5/2011 3:00 PM
PreProposal_CemeteryGroundsMaintenanceandROWMowing.pdfPre-Proposal Meeting Attendance12/5/2011 3:00 PM
QA1_CemeteryFroundsMaintenanceandROWMowing.pdfQ&A #112/5/2011 3:00 PM
Exhibit_1_CBD Mowing Map - 1st Ward.pdfCentral Business District Mowing Map (1st Ward)12/5/2011 3:00 PM
Exhibit_2_CBD Mowing Map - 2nd Ward.pdfCentral Business District Mowing Map (2nd Ward)12/5/2011 3:00 PM
Exhibit_3_CBD Mowing Map - 3rd Ward.pdfCentral Business District Mowing Map (3rd Ward)12/5/2011 3:00 PM
Exhibit_4_CBD Mowing Map - 4th Ward.pdfCentral Business District Mowing Map (4th Ward)12/5/2011 3:00 PM
Selection_CemeteryGroundsMaintenanceandROWMowing.pdfSelection Results12/5/2011 3:00 PM
collapse Project : Central Business District Right-of-Way Mowing - FY2013 (RFP2012-40) ‎(10)
Ad_CentralBusDistROWMowing-FY2013.pdfAdvertisement11/29/2012 3:00 PM
Prebid_CentralBusDistROWMowing-FY2013.pdfPre-Bid11/29/2012 3:00 PM
MowingMap-FirstWard_CentralBusDistROWMowing-FY2013.pdfExhibit: Mowing Map 1. First Ward11/29/2012 3:00 PM
MowingMap-SecondWard_CentralBusDistROWMowing-FY2013.pdfExhibit: Mowing Map 2. Second Ward11/29/2012 3:00 PM
MowingMap-ThirdWard_CentralBusDistROWMowing-FY2013.pdfExhibit: Mowing Map 3. Third Ward11/29/2012 3:00 PM
MowingMap-FourthWard_CentralBusDistROWMowing-FY2013.pdfExhibit: Mowing Map 4. Fourth Ward11/29/2012 3:00 PM
PreviousAward_CentralBusDistROWMowing-FY2013.pdfExhibit: Previous Award History11/29/2012 3:00 PM
Forms1_CentralBusDistROWMowing-FY2013.docForms 111/29/2012 3:00 PM
Forms2_CentralBusDistROWMowing-FY2013.docForms 211/29/2012 3:00 PM
Selection_CentralBusinessDistrictROWMowing-FY2013.pdfSelection11/29/2012 3:00 PM
collapse Project : Central District Grounds Maintenance FY11 (RFP2011-1) ‎(3)
Ad_CentralDistrictGroundsMaintenanceFY11.pdfAdvertisement4/8/2011 10:00 AM
Add1_CentralDistrictGroundsMaintenanceFY11.pdfAddendum 14/8/2011 10:00 AM
Award_CentralDistrictGroundsMaintenanceFY11.pdfAward4/8/2011 10:00 AM
collapse Project : Charlotte Area Transit System (CATS) Grounds Maintenance - FY2013 (RFP2012-37) ‎(32)
Ad_CATSGroundsMaintFY2013-RFP2012-37.pdfAdvertisement11/20/2012 3:00 PM
Forms_CATSGroundsMaintFY2013.dotForms11/20/2012 3:00 PM
PreBid_CATSGroundsMaintFY2013.pdfPre-Bid11/20/2012 3:00 PM
Exhibit_CATSSCSRTGM2009-1000387.pdfExhibit: CATS SC LRT Grounds Maint 200911/20/2012 3:00 PM
1 North Contract 9th Street Trolley Stop to 7th St Station.pdfNorth 01: 9th St Trolley to 7th St Station11/20/2012 3:00 PM
2 North Contract 7th Street Station to CTC_Arena Station.pdfNorth 02: 7th St to CTC Arena11/20/2012 3:00 PM
3 North Contract CTC_Arena Station to 3rd St Station.pdfNorth 03: CTC Arena to 3rd St11/20/2012 3:00 PM
4 North Contract 3rd Street Station to Stonewall St Station.pdfNorth 04: 3rd St to Stonewall St11/20/2012 3:00 PM
5 North Contract Stonewall St Station to Morehead St Station.pdfNorth 05: Stonewall St to Morehead St11/20/2012 3:00 PM
6 North Contract Morehead St Station to Carson Blvd Station.pdfNorth 06: Morehead St to Carson Blvd11/20/2012 3:00 PM
7 North Contract Carson Blvd Station to Bland St Station.pdfNorth 07: Carson Blvd to Bland St11/20/2012 3:00 PM
8 North Contract Bland St Station to East_West Blvd Station.pdfNorth 08: Bland St to East-West Blvd11/20/2012 3:00 PM
9 North Contract East_West Blvd to Tremont Trolley Stop.pdfNorth 09: East-West Blvd to Tremont Trolley11/20/2012 3:00 PM
10 North Contract Tremont Ave Trolley Stop to New Bern St St.pdfNorth 10: Tremont Ave to New Bern St11/20/2012 3:00 PM
11 North Contract New Bern Station to South Blvd Split.pdfNorth 11: New Bern Station to South Blvd Split11/20/2012 3:00 PM
CATS SOCOR North Map Location Description.pdfNorth 12: North Map Location Description11/20/2012 3:00 PM
North Contract.pdfNorth 13: North Contract Map11/20/2012 3:00 PM
1 South Contract Scaleybark to woodlawn.pdfSouth 01: Scaleybark to Woodlawn11/20/2012 3:00 PM
2 South Contract Woodlawn to Tyvola.pdfSouth 02: Woodlawn to Tyvola11/20/2012 3:00 PM
3 South Contract Tyvola St Station to Archdale St Stationmxd.pdfSouth 03: Tyvola to Archdale11/20/2012 3:00 PM
4 South Contract Archdale Dr Station to Arrowood St Station.pdfSouth 04: Archdale to Arrowood11/20/2012 3:00 PM
5 South Contract Arrowood St Station to Sharon Rd West Station.pdfSouth 05: Arrowood to Sharon Rd West11/20/2012 3:00 PM
6 South Contract Sharon Rd West Station to South Blvd Station.pdfSouth 06: Sharon Rd West to South Blvd11/20/2012 3:00 PM
7 South Contract I-485_SouthBlvd.pdfSouth 07: I-485 South Blvd11/20/2012 3:00 PM
CATS SOCOR South Map Location Description.pdfSouth 08: South Map Location Description11/20/2012 3:00 PM
South Contract.pdfSouth 09: South Contract Map11/20/2012 3:00 PM
Selection_CATSGroundsMaintFY2013.pdfSelection: CATS South Corridor Light Rail Transit North & South11/20/2012 3:00 PM
Selection2_CATSGroundsMaintFY2013.pdfSelection: CMPD Steele Creek Division Office + North Davidson Street Business Facility11/20/2012 3:00 PM
Summary(North)_CATSGroundsMaintFY2013.pdfSummary of Fees - North11/20/2012 3:00 PM
Summary(N.Davidson)_CATSGroundsMaintFY2013.pdfSummary of Fees - North Davidson11/20/2012 3:00 PM
Summary(South)_CATSGroundsMaintFY2013.pdfSummary of Fees - South11/20/2012 3:00 PM
Summary(SteeleCreek)_CATSGroundsMaintFY2013.pdfSummary of Fees - Steele Creek11/20/2012 3:00 PM
collapse Project : Charlotte-Mecklenburg Police Department (CMPD) Command Center (RFP2011-11) ‎(5)
Ad_Rev_Char-MeckPoliceDept(CMPD)-CommandCenter.pdfAdvertisement6/2/2011 2:00 PM
Add1_Char-MeckPoliceDept(CMPD)CommandCenter.pdfAddendum 16/2/2011 2:00 PM
Proposers_Char-MeckPoliceDept(CMPD_-CommandCenter.pdfProposers of Record6/2/2011 2:00 PM
Pre-Proposal_Char-MeckPoliceDept(CMPD)-CommandCenter.pdfPre-Proposal Attendance Log6/2/2011 2:00 PM
Selection_Char-MeckPoliceDept(CMPD)-CommandCenter.pdfSelection Results6/2/2011 2:00 PM
collapse Project : CharMeck Sustainability Plan Feasibility Study (RFQ2012-30) ‎(3)
Ad_CharMeckCommunitySustainabilityPlanFeasibilityStudy.pdfAdvertisement8/20/2012 5:00 PM
Add1_CharMeckCommunitySustainabilityPlanFeasibilityStudy.pdfAddendum 18/20/2012 5:00 PM
Selection_CharMeckCommunitySustainabilityPlanFeasibilityStudy.pdfSelection Results8/20/2012 5:00 PM
collapse Project : City Districts and CATS Grounds Maintenance - FY2012 (RFP2011-90) ‎(14)
Ad_CityDistrictsCATSGroundsMaintenanceFY2012.pdfAdvertisement11/28/2011 3:00 PM
Add1_CityDistrictsCATSGroundsMaintenanceFY2012.pdfAddendum 111/28/2011 3:00 PM
QA1_CityDistrictsCATSGroundsMaintenanceFY2012.pdfQ&A11/28/2011 3:00 PM
Photos_(01) West District.pdf01-West District11/28/2011 3:00 PM
Photos_(02) Center City West District.pdf02-Center City West District11/28/2011 3:00 PM
Photos_(03) Center City East District.pdf03-Center City East District11/28/2011 3:00 PM
Photos_(04) Government District.pdf04-Government District11/28/2011 3:00 PM
Photos_(05) CATS Bus Park and Ride.pdf05-CATS Bus Park & Ride Lots11/28/2011 3:00 PM
Photos_(06) CATS N Davidson St Bus Facility.pdf06-CATS North Davidson Street Bus Facility11/28/2011 3:00 PM
Photos_(07) CATS S Blvd Light Rail Facility.pdf07-CATS South Boulevard Light Rail Facility11/28/2011 3:00 PM
Photos_(08) Turf Maintenance (Partial).pdf08-Turf Management11/28/2011 3:00 PM
Photos_(09) CMPD Providence - Light Vehicle Facility.pdf09-CMPD Providence / Light Vehicle Facility11/28/2011 3:00 PM
Drawings_(09) CMPD Providence - Light Vehicle Facility.pdf09-CMPD Providence / Light Vehicle Facility11/28/2011 3:00 PM
Selection_CityDistrictsCATSGroundsMaintenanceFY2012.pdfSelection Results11/28/2011 3:00 PM
collapse Project : CMPD Headquarters Renovations and Various Architectural Services (RFQ2009-53) ‎(3)
Ad_CMPDHQRenovationsRFQ2009-53.pdfAdvertisement1/12/2010 5:00 PM
Add1_CMPDHQRenovationsFQ2009-53.pdfAddendum 11/12/2010 5:00 PM
Selection_CMPDHQRenovationsandVariousServices.pdfSelection1/12/2010 5:00 PM
collapse Project : CMU Dry Storage Shed and Various Architectural Services (RFQ2011-14) ‎(4)
Ad_CMUDryStorageShedandVariousArchServices.pdfAdvertisement7/19/2011 5:00 PM
Add1_CMUDryStorageShedandVariousArchServices.pdfAddendum 17/19/2011 5:00 PM
Exhibit2_Matrix_RFQ2011-14_CMUDryStorageShed.docExhibit 2: Matrix7/19/2011 5:00 PM
Selection_CMUDryStorageShedandVariousArchServices.pdfSelections7/19/2011 5:00 PM
collapse Project : Communications Center (RFQ2011-03) ‎(3)
Ad_CommunicationsCenter.pdfAdvertisement3/15/2011 5:00 PM
Add1_CommunicationsCenter.pdfAddendum 13/15/2011 5:00 PM
Selection_CommunicationsCenter.pdfSelection Results3/15/2011 5:00 PM
collapse Project : Congestion Management Process (RFQ2012-08) ‎(3)
Ad_CongestionManagementProcess.pdfAdvertisement3/27/2012 5:00 PM
Add1_CongestionManagementProcess.pdfAddendum 13/27/2012 5:00 PM
Forms_CongestionManagementProcess.docxProposer Forms3/27/2012 5:00 PM
collapse Project : Constructability Review and Claims Analysis (RFQ2010-07) ‎(4)
Ad_ConstructabilityReviewandClaimsAnalysis.pdfAdvertisement3/30/2010 5:00 PM
Add1_ConstructabilityReviewandClaimsAnalysis.pdfAddendum 13/30/2010 5:00 PM
Add2_ConstructabilityReviewandClaimsAnalysis.pdfAddendum 23/30/2010 5:00 PM
Selection_ConstructionabilityReviewandClaimsAnalysis.pdfSelection3/30/2010 5:00 PM
collapse Project : Constructability Review and Claims Analysis (RFQ2011-46) ‎(5)
Ad_ConstructabilityReviewandClaimsAnalysisRFQ2011-46.pdfAdvertisement10/5/2011 5:00 PM
Add1_ConstructabilityReviewandClaimsAnalysisRFQ2011-46.pdfAddendum 110/5/2011 5:00 PM
Exhibit_ConstructabilityReviewandClaimsAnalysisRFQ2011-46.docExhibit 2 - Matrix10/5/2011 5:00 PM
Selection_ConstructabilityReviewandClaimsAnalysisRFQ2011-46.pdfSelection Results10/5/2011 5:00 PM
Award_CostructabilityReviewandClaimsAnalysisRFQ2011-46.pdfAward10/5/2011 5:00 PM
collapse Project : Construction Inspection Services (RFQ2011-100) ‎(3)
Ad_ConstructionInspectionServices.pdfAdvertisement2/2/2012 5:00 PM
Add1_ConstructionInspectionServices.pdfAddendum 12/2/2012 5:00 PM
Selection_ConstructionInspectionServices.pdfSelection Results2/2/2012 5:00 PM
collapse Project : Construction Material Testing, QA/QC Oversight, and Special Inspection Services (RFQ 269-20130215001) ‎(3)
Ad_BLEConstructionMaterialTestingEtc.pdfAdvertisement3/14/2013 3:00 PM
Add1_BLEConstructionMaterialTestingEtc.pdfAddendum 13/14/2013 3:00 PM
Add2_BLEConstructionMaterialTestingEtc.pdfAddendum 23/14/2013 3:00 PM
collapse Project : Contract Development and Procurement Consulting Services (RFQ2010-40) ‎(3)
Ad_ContractDevelopmentProcurementConsultingServices.pdfAdvertisement10/22/2010 5:00 PM
Add1_ContractDevelopmentProcurementConsultingServices.pdfAddendum 110/22/2010 5:00 PM
Exhibit2_ContractDevelopmentProcurementConsultingServices.docExhibit 2 (Matrix Template)10/22/2010 5:00 PM
collapse Project : Curb Lane Management Study (RFP2010-48) ‎(3)
Ad_CurbLaneManagementStudy.pdfAdvertisement12/16/2010 5:00 PM
Exhibit1_CurbLaneManagementStudy.docExhibit 1 - Matrix12/16/2010 5:00 PM
Results_CurbLaneManagementStudy.pdfSelection12/16/2010 5:00 PM
collapse Project : Demolition Projects (RFP2012-38) ‎(2)
Ad_DemolitionProjectsRFP2012-38.pdfAdvertisement12/18/2012 2:00 PM
Add1_DemolitionProjectsRFP2012-38.pdfAddendum 112/18/2012 2:00 PM
collapse Project : Design Services for Charlotte Mecklenburg Law Enforcement Center Energy Efficient Upgrades (RFQ2012-26) ‎(6)
Ad_DesignSvcsChar-MeckLEC-EnergyUpgrades.pdfAdvertisement11/28/2012 3:00 PM
Add1_DesignSvcsChar-MeckLEC-EnergyUpgrades.pdfAddendum 111/28/2012 3:00 PM
Exhibit1_RestrictedDataPolicy_DesignSvcsChar-MeckLEC-EnergyUpgrades.pdfExhibit 1: Restricted Data Policy11/28/2012 3:00 PM
Exhibit2_ConfidentialityAgreement_DesignSvcsChar-MeckLEC-EnergyUpgrades.pdfExhibit 2: Confidentiality Agreement11/28/2012 3:00 PM
Pre-Submittal_RFQ2012-26_CMPDLEC_EnergyEfficientUpgrades.pdfPre-Submittal Walk-Thru Attendance Log11/28/2012 3:00 PM
Selection_DesignSvcsChar-MeckLEC-EnergyUpgrades.pdfSelection11/28/2012 3:00 PM
collapse Project : Design Services for Photovoltaic Systems (RFQ2010-23) ‎(3)
Ad_DesignServicesforPhotovoltaicSystems.pdfAdvertisement6/11/2010 5:00 PM
Add1_DesignServicesforPhotovoltaicSystems.pdfAddendum 16/11/2010 5:00 PM
Selection_DesignServicesforPhotovoltaicSystems.pdfSelection6/11/2010 5:00 PM
collapse Project : Design Services for the Energy Efficiency and Conservation Block Grant (EECG) Funded Projects (RFQ2010-9) ‎(6)
Ad_DesignServicesforEECGGrantProjectsRFQ2010-9.pdfAdvertisement4/9/2010 5:00 PM
Add1_DesignServicesforEECGGrantProjectsRFQ2010-9.pdfAddendum 14/9/2010 5:00 PM
Add2_DesignServicesforEECGGrantProjectsRFQ2010-9.pdfAddendum 24/9/2010 5:00 PM
EECBGRevEnergyStrategy_DesignServicesforEECGGrantProjectsRFQ2010-9.pdfEECBG Revised Energy Strategy5/27/2010 5:00 PM
PreDesignStudy_DesignServicesforEECGGrantProjectsRFQ2010-9.pdfPre-Design Study (Existing Conditions) CMU Building4/9/2010 5:00 PM
Selection_DesignServicesforEECBGFundedProjects.pdfSelection4/9/2010 5:00 PM
collapse Project : Disaster Debris Removal and Debris Management Services (RFP2012‐29) ‎(4)
Ad_DisasterDebrisRemovalandDebrisManagementSvcs-RFP.pdfAdvertisement8/28/2012 5:00 PM
Add1_DisasterDebrisRemovalandDebrisManagementSvcs-RFP.pdfAddendum 18/28/2012 5:00 PM
Forms_ ExhibitsA-E_DisasterDebrisRemovalandDebrisMgmtSvcs.docForms: Exhibits A - E8/28/2012 5:00 PM
Selection_DisasterDebrisRemovalandDebrisMgmtSvcs-RFP2012-29.pdfSelection8/28/2012 5:00 PM
collapse Project : Discovery Place: Design/Build of Photovoltaic System & Electric Charging Stations (RFP DP0001) ‎(7)
AD_DiscoveryPlacePhotovotaicandEVS.pdfAdvertisement6/17/2011 5:00 PM
Add1_DiscoveryPlacePhotovoltaicandEVS.pdfAddendum 16/17/2011 5:00 PM
Add2_DiscoveryPlacePhotovotaicandEVS.pdfAddendum 26/17/2011 5:00 PM
Discovery Place As-Builts - Structural.pdfExhibit: As-Built Drawings - Structural6/17/2011 5:00 PM
Discovery Place As-Builts - Electrical.pdfExhibit: As-Built Drawings - Electrical6/17/2011 5:00 PM
PreProposal_DiscoveryPlacePhotovoltaicandEVS.pdfPre-Proposal Meeting Attendance Log6/17/2011 5:00 PM
Selection_DiscoveryPlacePhotovoltaicandEVS.pdfSelection6/17/2011 5:00 PM
collapse Project : East District Grounds Maintenance FY13 (RFP2012-34) ‎(19)
Ad_EastDistGrdsMaint-RFP2012-34.pdfAdvertisement11/5/2012 3:00 PM
Add1_EastDistGrdsMaint-FRP2012-34.pdfAddendum 111/5/2012 3:00 PM
PreBid_EastDistGrdsMaint.pdfPre-Bid11/5/2012 3:00 PM
Exhibit_BelmontCenter1.pdfExhibit: Belmont Center 111/5/2012 3:00 PM
Exhibit_CentralAveParkingLot.pdfExhibit: Central Ave Parking Lot11/5/2012 3:00 PM
Exhibit_CMPDProvidence.pdfExhibit: CMPD Providence11/5/2012 3:00 PM
Exhibit_FirePreventionBureau1.pdfExhibit: Fire Prevention Bureau 111/5/2012 3:00 PM
Exhibit_FireWarehouse.pdfExhibit: Fire Warehouse11/5/2012 3:00 PM
Exhibit_LightVehicleFacility.pdfExhibit: Light Vehicle Facility11/5/2012 3:00 PM
Exhibit_LouiseAveEquipmentServices1.pdfExhibit: Louise Ave Equipment Services 111/5/2012 3:00 PM
Exhibit_SanitationTruckParkingLot1.pdfExhibit: Sanitation Truck Parking Lot 111/5/2012 3:00 PM
Exhibit_SanitationTruckWashingStation1.pdfExhibit: Sanitation Truck Washing Station 111/5/2012 3:00 PM
Exhibit_SolidWasteEmployeeParkingLots.pdfExhibit: Solid Waste Employee Parking Lots11/5/2012 3:00 PM
Exhibit_SolidWasteOffice.pdfExhibit: Solid Waste Office11/5/2012 3:00 PM
Exhibit_SpecialServicesHoldingLot21.pdfExhibit: Special Services Holding Lot 2111/5/2012 3:00 PM
Exhibit_SpecialServicesHoldingLot3.pdfExhibit: Special Services Holding Lot 311/5/2012 3:00 PM
Exhibit_StreetMaintOrrRd1.pdfExhibit: Street Maintenance Orr Rd 111/5/2012 3:00 PM
Selection_EastDistGrdsMaint-RFP2012-34.pdfSelection11/6/2012 3:00 PM
Summary_EastDistGrdsMaint.pdfSummary of Fees (East District Grounds Maint)11/5/2012 3:00 PM
collapse Project : Environmental Permitting Services (RFQ2011-06) ‎(3)
Ad_EnvironmentalPermittingServicesRFQ2011-06.pdfAdvertisement4/8/2011 12:00 PM
Exhibit1_EnvironmentalPermittingServicesRFQ2011-06.docExhibit 1 (Matrix)4/8/2011 12:00 PM
Selection_EnvironmentalPermittingServices.pdfSelection Results4/8/2011 12:00 PM
collapse Project : Environmental Rapid and Emergency Response Services FY2013 (RFP2012-25) ‎(5)
Ad_EnvironmentalRapidandEmergencyResponseServices.pdfAdvertisement8/7/2012 5:00 PM
Add1_EnvironmentalRapidandEmergencyResponseServices.pdfAddendum 18/7/2012 5:00 PM
Add2_EnvironmentalRapidandEmergencyResponseServices.pdfAddendum 28/7/2012 5:00 PM
Add2_ExhibitB_EnvironmentalRapidandEmergecyResponseService.docForms: Exhibit B - Itemized Proposal8/7/2012 5:00 PM
Forms_EnvironmentalRapidandEmergencyResponseServicesFY2013.docxForms: Exhibits A - E8/7/2012 5:00 PM
collapse Project : Environmental Services (RFQ2010-38) ‎(4)
Ad_EnvironmentalServicesRFQ2010-38.pdfAdvertisement10/21/2010 5:00 PM
Add1_EnvironmentalServicesRFQ2010-38.pdfAddendum 110/21/2010 5:00 PM
Exhibit2_EnvironmentalServicesRFQ2010-38.docExhibit (Matrix Template)10/21/2010 5:00 PM
Results_EnvironmentalServicesRFQ2010-38.pdfSelection Results10/21/2010 5:00 PM
collapse Project : Geotechnical & Construction Materials Testing Services (RFQ2010-0) ‎(4)
Ad_GeotechnicalConstructionMaterialsTestingRFQ2010-0.pdfAdvertisement3/12/2010 12:00 PM
Add1_GeotechnicalConstructionMaterialsTestingRFQ2010-0.pdfAddendum 13/12/2010 12:00 PM
Award_GeotechnicalTestingRFQ201010.pdfAward3/12/2010 12:00 PM
Selection_GeotechnicalConstructionMatTestingServices.pdfSelection3/12/2010 12:00 PM
collapse Project : Geotechnical & Construction Materials Testing Services (RFQ2010-26) ‎(5)
Ad_GeotechConstructionMaterialsTestingRFQ2010-26.pdfSUBMITTAL DATE CHANGED PER ADDENDUM 28/18/2010 12:00 PM
Add1_GeotechnicalConstructionMaterialsTestingRFQ2010-26.pdfAddendum 18/18/2010 12:00 PM
Add2_GeotechnicalConstructionMaterialsTestingRFQ2010-26.pdfAddendum 28/18/2010 12:00 PM
Exhibit2-GeotechnicalConstructionMatTestingSvcs.docExhibit 2 (Matrix Template)8/18/2010 12:00 PM
Selection_GeotechConstructionMaterialsTestingRFQ2010-26.pdfSelection8/18/2010 12:00 PM
collapse Project : Geotechnical, Construction Materials Testing, and Special Inspections Services (RFQ2011-102) ‎(5)
Ad_GeotechnicalConstructionMaterialTestingandSpecialInspectionsServices.pdfAdvertisement2/23/2012 5:00 PM
Add1_GeotechnicalConstructionMaterialsTestingandSpecialInspectionsServices.pdfAddendum 12/23/2012 5:00 PM
FormAB_GeotechnicalConstructionMaterialTestingandSpecialInspectionsServices.docForms A & B2/23/2012 5:00 PM
Award_GeotechConstMatTestingandSpecialInspectionServices.pdfAward2/23/2012 5:00 PM
Selection_GeotechConstMatTesting+SpecialInspectionServices.pdfSelection Results2/23/2012 5:00 PM
collapse Project : Grade Separation Feasibility Study (RFQ2011-42) ‎(4)
Ad_GradeSeparationFeasibilityStudy.pdfAdvertisement10/12/2011 5:00 PM
Add1_GradeSeparationFeasibilityStudy.pdfAddendum 110/12/2011 5:00 PM
Forms_GradeSeparationFeasibilityStudy.docForms A, B, C, D-1 & D-210/12/2011 5:00 PM
Selection_GradeSeparationFeasibilityStudy.pdfSelection Results10/12/2011 5:00 PM
collapse Project : I-277/I-77 Loop Study (RFQ2011-50) ‎(4)
Ad_I-277I-77LoopStudy.pdfAdvertisement10/17/2011 5:00 PM
Add1_I-277LoopStudy.pdfAddendum 110/17/2011 5:00 PM
Forms_I-277I-77LoopStudy.docForms A, B, C, D-1 & D-210/17/2011 5:00 PM
Selection_I-277-I77LoopStudy.pdfSelection Results10/17/2011 5:00 PM
collapse Project : Landscape Irrigation System Installation and Repair - FY2012 (RFP2012-17) ‎(4)
Ad_LandscapeIrrigationSystemInstallationRepairFY2012.pdfAdvertisement6/13/2012 1:00 PM
Add1_LandscapeIrrigationSystemInstallationRepairFY2012.pdfAddendum 16/13/2012 1:00 PM
PreBid_LandscapeIrrigationSystemInstallationRepairFY2012.pdfPre-Proposal Attendees6/13/2012 1:00 PM
Selection_LandscapeIrrigationSystemInstallationRepairFY2012.pdfSelection Results6/13/2012 1:00 PM
collapse Project : Lead Hazard Control Program (RFP2012-41) ‎(2)
Ad_LeadHazardControlProgram.pdfAdvertisement1/3/2013 2:00 PM
Selection_LeadHazardControlProgram.pdfSelection1/3/2013 2:00 PM
collapse Project : LYNX Blue Line Extension Real Estate Appraisal and Review Appraisal Services (RFP2011-24) ‎(8)
Ad_LYNX_BLE_RealEstateAppraisalandReviewAppraisalServicesRFP2011-24.pdfAdvertisement8/10/2011 10:00 AM
Add1_LUNX_BLE_RealEstateAppraisalandReviewAppraislServicesRFP2011-24.pdfAddendum 18/10/2011 10:00 AM
Add2_LYNX_BLE_RealEstateAppraisalandReviewAppraisalServicesRFP2011-24.pdfAddendum 28/10/2011 10:00 AM
FormB_LYNX_BLE_RealEstateAppraisalandReviewAppraisalServices.xlsForm B - Key Team Member Matrix8/10/2011 10:00 AM
Pre-Proposal_RFP2011-24_LYNXBLERealEstateAppraisalandReviewAppraisalServices.pdfPre-Proposal Sign In (10 sheets)8/10/2011 10:00 AM
DBE_LYNXBLERealEstateAppraisalandReviewAppraisalServices.pptPre-Proposal Meeting DBE Presentation8/10/2011 10:00 AM
Selection_LYNX_BLE_RealEstateAppraisalandReviewAppraisalServicesFRP2011-24.pdfSelection Results8/10/2011 10:00 AM
Award_LYNX_BLE_RealEstateAppraisalandReviewAppraisalServicesRFP2011-24.pdfAward8/10/2011 10:00 AM
collapse Project : LYNX Blue Line Extension Real Estate Legal Services (RFP2011-28) ‎(6)
AD_LYNX-BLE_RealEstateLegalServicesRFP2011-28.pdfAdvertisement8/10/2011 10:00 AM
Add1_LYNX_BLE_RealEstateLegalServicesRFP2011-28.pdfAddendum 18/10/2011 10:00 AM
FormB_LYNX_BLE_LegalServices.xlsForm B - Key Team Member Matrix8/10/2011 10:00 AM
Pre-Proposal_RFP2011-28_LYNXBLERealEstateLegalServices.pdfPre-Proposal Sign In (10 Sheets)8/10/2011 10:00 AM
DBE_LYNXBLERealEstateLegalServices.pptPre-Proposal Meeting DBE Presentation8/10/2011 10:00 AM
Selection_LYNX-BLE_RealEstateLegalServicesRFP2011-28.pdfSelection Results8/10/2011 10:00 AM
collapse Project : LYNX Blue Line Extension Real Estate Right-of-Way Acquisition and Relocation Services (RFP2011-26) ‎(7)
Ad_LYNX_BLE_RealEstateROWAcquisitionRFP2011-26.pdfAdvertisement8/10/2011 10:00 AM
Add1_LYNX_BLE_RealEstateROWAcquisitionRFP2011-26.pdfAddendum 18/10/2011 10:00 AM
Add2_LYNX_BLE_RealEstateROWAcquisitionRFP2011-26.pdfAddendum 28/10/2011 10:00 AM
FormB-LYNX_BLE_RealEstateRightofWayAcquisitionandRelocationServices.xlsForm B - Key Team Member Matrix8/10/2011 10:00 AM
Pre-Proposal_RFP2011-26_LYNXBLERealEstateROWAcquisitionandRelocationServices.pdfPre-Proposal Sign In (10 Sheets)8/10/2011 10:00 AM
DBE_LYNXBLERealEstateROWAcquisitionandRelocationServices.pptPre-Proposal Meeting DBE Presentation8/10/2011 10:00 AM
Selection_LYNX-BLE_RealEstateROWAcquisitionRFP2011-26.pdfSelection Results8/10/2011 10:00 AM
collapse Project : M Baker Place Barringer Drive Bridge Replacement (RFQ2012-12) ‎(4)
Ad_MBakerPlBarringerDrBridgeReplacement.pdfAdvertisement6/27/2012 5:00 PM
Add1_MBakerPlBarringerDrBridgeReplacement.pdfAddendum 16/27/2012 5:00 PM
Forms_MBakerPlBarringerDrBridgeReplacement.docForms6/27/2012 2:00 PM
Selection_MBakerPlBarringerDrBridgeReplacement.pdfSelection6/27/2012 5:00 PM
collapse Project : Managed (Fast) Lanes Study - Phase III (RFQ2011-48) ‎(3)
Ad_ManagedFastLanesStudy-PhIII.pdfAdvertisement10/20/2011 5:00 PM
Forms_ManagedFastLanesStudy.docForms A, B, C, D-1 & D-210/20/2011 5:00 PM
Selection_ManagedFastLanesStudyPhIII.pdfSelection Results10/20/2011 5:00 PM
collapse Project : Media Buying and Creative Services for Storm Water Educational Media Campaign (RFQ2012-24) ‎(5)
Ad_MediaBuyingandCreativeServices.pdfAdvertisement8/20/2012 5:00 PM
Add1_MediaBuyingandCreativeServices.pdfAddendum 18/20/2012 5:00 PM
Add2_MediaBuyingandCreativeServices.pdfAddendum 28/20/2012 5:00 PM
Forms_MediaBuyingandCreativeServices.docxForms8/20/2012 5:00 PM
Selection_MediaBuyingandCreativeServices.pdfSelection Results8/20/2012 5:00 PM
collapse Project : Media Buying Services for Storm Water Educational Outreach Campaign (RFQ2009-50) ‎(4)
Ad_MediaBuyingServicesforStormWaterEducationalOutreach.pdfAdvertisement1/14/2010 5:00 PM
Add1_MediaBuyingServicesforStormWaterEducationalOutreach.pdfAddendum 11/14/2010 5:00 PM
Award_MediaBuyingservices.pdfAward1/14/2010 5:00 PM
Selection_MediaBuyingServicesStormWater.pdfSelection1/14/2010 5:00 PM
collapse Project : Median Maintenance - FY2012 (RFP2011-18) ‎(6)
Ad_MedianMaintenanceFY2012RFP2011-18.pdfAdvertisement11/23/2011 3:00 PM
Add1_MedianMaintenanceFY2012RFP2011-18.pdfAddendum 111/23/2011 3:00 PM
Add2_MedianMaintenanceFY2012RFP2011-18.pdfAddendum 211/23/2011 3:00 PM
Add3_MedianMaintenanceFY2012RFP2011-18.pdfAddendum 311/23/2011 3:00 PM
PreProposal_MedianMaintenanceFY2012RFP2011-18.pdfPre-Proposal11/23/2011 3:00 PM
Selection_MedianMaintenanceFY2012RFP2011-18.pdfSelection Results11/23/2011 3:00 PM
collapse Project : Median Maintenance for 2010-2013 (for North "A" &North "B" Areas) (RFP2009-43) ‎(3)
Ad_MedianMaint2010-2013forNorthANorthBRFP2009-43.pdfAdvertisement1/7/2010 10:00 AM
Add1_MedianMaint2010-2013forNorthANorthBRFP2009-43.pd.pdfAddendum1/7/2010 10:00 AM
Award_MedianMaintenance2010-2013NorthAandB.pdfAward1/7/2010 10:00 AM
collapse Project : Median Maintenance for 2011-2014 (RFP2010-47) ‎(3)
Ad_MedianMaintenancefor2011-2014.pdfAdvertisement1/20/2011 10:00 AM
ProposalSection_MedianMaintenancefor 2011-2014.pdfProposal Section1/20/2011 10:00 AM
Award_MedianMaintenancefor2011-2014.pdfAward1/20/2011 10:00 AM
collapse Project : Median Maintenance FY08 (Districts East A, East B, South A, South B, West A, West B) (RFP2007-27) ‎(5)
Ad_MedianMaintenance2008.pdfAdvertisement1/4/2008 10:00 AM
Add1_MedianMaintenance2008.pdfAddendum 11/4/2008 10:00 AM
Map_MedianMaintenance2008.pdfExhibit: Median Maintenance Districts Map1/4/2008 10:00 AM
Selection_MedianMaintenance2008.pdfSelection Results1/4/2008 10:00 AM
Award_MedianMaintenance2008.pdfAward1/4/2008 10:00 AM
collapse Project : NBIS Bridge/Culvert Inspection Program (0) ‎(3)
Ad_NBISBridgeCulvertInspectionProgram.pdfAdvertisement3/12/2010 5:00 PM
Add1_NBISBridgeCulvertInspectionProgram.pdfAddendum 13/12/2010 5:00 PM
Selection_NBISBridgeCulvertInspectionPgm.pdfSelection3/12/2010 5:00 PM
collapse Project : Non-Fema Debris Removal Services (RFP2013-50) ‎(3)
Ad_Non-FEMADebrisRemovalSvcs.pdfAdvertisement2/21/2013 5:00 PM
Forms_Non-FEMADebrisRemovalSvcs.docForms2/21/2013 5:00 PM
Selection_Non-FemaDebrisRemovalSvcs.pdfSelection2/21/2013 5:00 PM
collapse Project : On-Call Consultant Services for MUMPO (RFQ2012-13) ‎(4)
RFQ2012-13 MUMPO On-Call Services FINAL 04-30-12.pdfAdvertisement5/24/2012 5:00 PM
Add1_On-CallConsultantServicesforMUMPO.pdfAddendum 15/24/2012 5:00 PM
Forms_RFQ2012-13 MUMPO On-Call Services FINAL04-30-12.docForms5/24/2012 5:00 PM
Selection_On-CallConsultantServicesforMUMPO.pdfSelection5/24/2012 5:00 PM
collapse Project : Ornamental Fountain Maintenance Services (2011-2014) (RFP2011-5) ‎(2)
Ad_OrnamentalFountainMaintenance2011-2014.pdfAdvertisement3/31/2011 10:00 AM
Award_OrnamentalFountainMaintenance2011-2014.pdfAward3/31/2011 10:00 AM
collapse Project : Petroleum Tank Design (RFQ2010-14) ‎(2)
Ad_PetroleumTankDesign.pdfAdvertisement5/14/2010 5:00 PM
Selection_PetroleumTankDesign.pdfSelection5/4/2010 5:00 PM
collapse Project : Petroleum Tank Maintenance Services (RFP2011-64) ‎(4)
Ad_PetroleumTankMaintenanceServices.pdfAdvertisement1/18/2012 5:00 PM
Add1_PetroleumTankMaintenanceServices.pdfAddendum 11/18/2012 5:00 PM
FormB_PetroleumTankMaintenanceServices.docxForm B1/18/2012 5:00 PM
Selection_PetroleumTankMaintenanceServices.pdfSelection Results1/18/2012 5:00 PM
collapse Project : Pipe Video Inspection Services (FY10) (RFP2009-4) ‎(2)
Results_PipeVideoInspFY10).pdfPricing Comparisons5/26/2009 10:00 AM
Pipe Video Inspection Services - RFP (043009).pdfAdvertisement5/26/2009 10:00 AM
collapse Project : Police Stations and Maintenance Facility Expansions (RFQ2010-33) ‎(5)
Ad_PoliceStationsandMaintenanceFacilityExpansions.pdfAdvertisement9/8/2010 5:00 PM
Add1_PoliceStationsandMaintenanceFacilityExpansions.pdfAddendum 19/8/2010 5:00 PM
Exhibit4_PoliceStationsandMaintenanceFacilityExpansions.docExhibit 4 (Matrix Template)9/8/2010 5:00 PM
Selection_PoliceStationsandMaintenanceFacilityExpansions.pdfSelection9/8/2010 5:00 PM
Award_PoliceStationsandMaintenanceFacilityExpansions.pdfAward - CMPD Steele Creek Division9/8/2010 5:00 PM
collapse Project : Private Sign, Light and Fence Relocation FY2013 (RFP2012-44) ‎(2)
Ad_PrivateSignLightandFenceRelocation.pdfAdvertisement2/19/2013 3:00 PM
Selection_PrivateSignLightFenceRelocation.docxSelection2/19/2013 3:00 PM
collapse Project : Railroad Corridor Appraisal for the CATS Blue Line Extension (RFP2010-39) ‎(3)
Ad_RRCorridorAppraisalfortheCATSBlueLineExtension.pdfAdvertisement11/11/2010 5:00 PM
Exhibit_Maps_RRCorridorAppraisalforthe CATSBlueLineExtension.docExhibit 3 - Maps (Magnifiable)11/11/2010 5:00 PM
Results_RRCorridorAppraisalfortheCATSBlueLineExtension.pdfSelection Results11/15/2010 5:00 PM
collapse Project : Railroad Corridor Appraisal for the CATS Blue Line Extension (RFP2012-00) ‎(4)
Ad_RRCorridorAppraisalforCATSBLE.pdfAdvertisement4/3/2012 5:00 PM
Add1_RRCorridorAppraisalforCATSBLE.pdfAddendum 14/3/2012 5:00 PM
Forms_RRCorridorAppraisalforCATSBLE.docForms4/3/2012 5:00 PM
Selection_RRCorridorAppraisalforCATSBLE.pdfSelection Results4/3/2012 5:00 PM
collapse Project : Real Estate Appraisal and Review Appraisal Services for Federally-Funded Projects (RFP2012-22) ‎(6)
Ad_RealEstateAppraisal-ReviewAppraisalServices-Federal.pdfAdvertisement10/31/2012 5:00 PM
Add1_RealEstateAppraisal-ReviewAppraisalServices-Federal.pdfAddendum 110/31/2012 5:00 PM
Exhibit_FormB_RealEstateAppraisal-ReviewAppraisal-Federal.docExhibit: Form B10/31/2012 5:00 PM
Exhibit_RestrictedData_RealEstateAppraisal-ReviewServices-Federal.pdfExhibit: E&PM Restricted Data Policy10/31/2012 5:00 PM
Exhibit_CMU_RealEstateAppraisal-ReviewAppraisalServices-Federal.pdfExhibit: Char-Meck Utilities Data Security Policies & Procedures10/31/2012 5:00 PM
Selections_RealEstateAppraisal-ReviewAppraisalServices-Federal.pdfSelection10/31/2012 5:00 PM
collapse Project : Real Estate Appraisal Services (RFP2011-68) ‎(5)
Ad_RealEstateAppraisalServices.pdfAdvertisement11/3/2011 5:00 PM
Add1_RealEstateAppraisalServices.pdfAddendum11/3/2011 5:00 PM
PreProposal_RealEstateAppraisalServices.pdfPre-Proposal11/3/2011 5:00 PM
Selection_RealEstateAppraisalServices.pdfSelection Results11/3/2011 5:00 PM
Award_RealEstateAppraisalServices.pdfAward11/3/2011 5:00 PM
collapse Project : Real Estate Broker Services for Surplus City Properties (RFQ2012-20) ‎(4)
Ad_REBrokerServicesforSurplusCityProperties.pdfAdvertisement7/17/2012 5:00 PM
Add1_REBrokerServicesforSurplusCityProperties.pdfAddendum 17/17/2012 5:00 PM
Forms_REBrokerServicesforSurplusCityProperties.docForms7/17/2012 5:00 PM
Selection_REBrokerServicesforSurplusCityProperties.pdfSelection Results7/17/2012 5:00 PM
collapse Project : Real Estate Leasing and Property Management Services (RFP2010-41) ‎(4)
Ad_RealEstateLeasingandPropertyMgmtSvcsRFP2010-41.pdfAdvertisement11/16/2010 5:00 PM
Add1_RealEstateLeasingandPropertyMgmtSvcsRFP2010-41.pdfAddendum 111/16/2010 5:00 PM
Exhibit 1_RealEstateLeasingandPropertyMgmtSvcsRFP2010-41.docxExhibit 1 Matrix Template11/16/2010 5:00 PM
Results_RealEstateLeasingand PropertyMgmtSvcsRFP2010-41.pdfSelection Results11/16/2010 5:00 PM
collapse Project : Real Estate Legal Services for Various Federally-Funded Projects (RFP2012-23) ‎(6)
Ad_RealEstateLegalServicesFederal.pdfAdvertisement10/31/2012 5:00 PM
Add1_RealEstateLegalServicesFederal.pdfAddendum 110/31/2012 5:00 PM
Exhibit_FormB_RealEstateLegalServicesFederal.docExhibit: Form B10/31/2012 5:00 PM
Exhibit_RestictedData_RealEstateLegalServicesFederal.pdfExhibit: E&PM Restricted Data Policy10/31/2012 5:00 PM
Exhibit_CMU_RealEstateLegalServicesFederal.pdfExhibit: Char-Meck Utilities Data Security Policies & Procedures10/31/2012 5:00 PM
Selections_RealEstateLegalServicesFederal.pdfSelection10/31/2012 5:00 PM
collapse Project : Real Estate Right-of-Way Acquisition & Relocation Services for Various Federally-Funded Projects (RFQ2012-21) ‎(6)
Ad_RealEstateROWAcquisitionRelocationFederal.pdfAdvertisement11/1/2012 5:00 PM
Add1_ROWAcquisitionandRelocationSvcs2012.pdfAddendum 111/1/2012 5:00 PM
Exhibit_FormB_RealEstateROWAquisitionRelocationFederal.docExhibit: Form B11/1/2012 5:00 PM
Exhibit_RestrictedData_RealEstateROWAquisitionRelocationFederal.pdfExhibit: E&PM Restricted Data Policy11/1/2012 5:00 PM
Exhibit_CMU_RealEstateROWAquisitionRelocationFederal.pdfExhibit: Char-Meck Utilities Data Security Policies & Procedures11/1/2012 5:00 PM
Selection_RealEstateROWAcquisitionFederal.pdfSelection11/1/2012 5:00 PM
collapse Project : Reedy Creek Stream Restoration Design-Build Project (RFQ2012-19) ‎(6)
Ad_ReedyCreekStreamRestorationDesign-BuildProject.PDFAdvertisement8/28/2012 5:00 PM
Add1_ReedyCreekStreamRestDesign-BuildProjectRFQ2012-19.pdfAddendum 18/28/2012 5:00 PM
Add2_ReedyCreekStreamRestDesign-BuildProjectRFQ2012-19.pdfAddendum 28/28/2012 5:00 PM
Add3_ReedyCreekStreamRestDesign-BuildProjectRFQ2012-19.pdfAddendum 38/28/2012 5:00 PM
Add4_ReedyCreekStreamRestDesign-BuildProjectRFQ2012-19.pdfAddendum 48/28/2012 5:00 PM
Forms_ReedyCreekStreamRestorationDesign-BuildProject.docForms8/28/2012 5:00 PM
collapse Project : Reprographic Services (RFP2010-43) ‎(3)
Ad_ReprographicServices.pdfAdvertisement3/8/2011 5:00 PM
Add1_ReprographicServices.pdfAddendum 13/8/2011 5:00 PM
Selection_Reprographic ServicesRFP2010-43.pdfSelection Results3/8/2011 5:00 PM
collapse Project : Right-of-Way Acquisition and Relocation Services (RFQ2010-29) ‎(3)
Ad_RightofWayAcquisitionandRelocationServices.pdfAdvertisement9/17/2010 12:00 PM
Exhibit2_RightofWayAcquisitionandRelocationServices.docExhibit 2 (Matrix Template)9/17/2010 12:00 PM
Selection_RightofWayAcquisitionandRelocationServices.pdfSelection9/17/2010 12:00 PM
collapse Project : Right-of-Way Acquisition and Relocation Services (RFQ2012-18) ‎(3)
Ad_RightofWayAcquisitionandRelocationsServices2012.pdfAdvertisement7/30/2012 5:00 PM
FormB_RightofWayAcquisitionandRelocationServices2012.docAdvertisement7/30/2012 5:00 PM
Selections_ROWAcquisitionandRelocationSvcs2012.pdfSelection Results7/30/2012 5:00 PM
collapse Project : Roadway Classification Study (RFQ2011-66) ‎(4)
Ad_RoadwayClassificationStudy.pdfAdvertisement10/12/2011 5:00 PM
Add1_RoadwayClassificationStudy.pdfAddendum 110/12/2011 5:00 PM
Forms_RoadwayClassificationStudy.docForms A, B, C, D-1 & D-210/12/2011 5:00 PM
Selection_RoadwayClassificationStudy.pdfSelection Results10/12/2011 5:00 PM
collapse Project : Roof Inspections and Maintenance RFP 2013-48 (RFP2013-48) ‎(2)
Ad_ RoofInspectAndMaintFY2013-48.pdfAdvertisement3/12/2013 3:00 PM
Roof Inspections and Maintenance - Tables.docItemized Proposal3/12/2013 3:00 PM
collapse Project : SCIP Grounds Maintenance FY11 (RFP2011-2) ‎(3)
Ad_SCIPGroundsMaintenanceFY11.pdfAdvertisement4/8/2011 10:00 AM
Add1_SCIPGroundsMaintenanceFY11.pdfAddendum 14/8/2011 10:00 AM
Award_SCIPGroundsMaintenanceFY11.pdfAward4/8/2011 10:00 AM
collapse Project : Sidewalks, Transit Station Area Infrastructure, and Various Other Projects (RFQ2010-31) ‎(5)
Ad_SidewalksTransitStationInfrastructureVariousRFQ2010-31.pdfAdvertisement8/11/2010 5:00 PM
Add1_SidewalksTransitStationAreaInfrastructure.pdfAddendum 18/11/2010 5:00 PM
Add2_SidewalksTransitStationAreaInfrastructure.pdfAddendum 28/11/2010 5:00 PM
Exhibit1_SidewalksTransitStationInfrastructureVariousRFQ2010-31.docExhibit1 (Matrix Template)8/11/2010 5:00 PM
Selections_SidewalksTransitStationsInfrastructureVariousRFP2010-31.pdfSelection8/11/2010 5:00 PM
collapse Project : Storm Debris Removal FY10 (RFP2010-5) ‎(2)
Ad_StormDebrisRemovalFY10RFP2010-5.pdfAdvertisement4/9/2010 10:00 AM
Award_StormDebrisRemoval.pdfAward4/9/2010 10:00 AM
collapse Project : Storm Water Services Education Campaign Assessment (RFP2012-02) ‎(4)
Ad_StormWaterServicesEducationCampaignAssessment.pdfAdvertisement1/27/2012 5:00 PM
Add1_StormWaterServicesEducationCampaignAssessment.pdfAddendum 11/27/2012 5:00 PM
Exhibit_FormA_StormWaterServicesEducationCampaignAssessment.docForm A1/27/2012 5:00 PM
Selection_StormWaterServicesEducationCampaignAssessment.pdfSelection Results1/27/2012 5:00 PM
collapse Project : Storm Water Services Pipe Video Inspection Services FY2013 (RFP2012-43) ‎(5)
Ad_SWSPipeVideoInspection.pdfAdvertisement2/25/2013 3:00 PM
Add1_SWSPipeVideoInspection.pdfAddendum 12/25/2013 3:00 PM
Add2_SWSPipeVideoInspection.pdfAddendum 22/25/2013 3:00 PM
Forms_SWSPipeVideoInspection.pdfForms2/25/2013 3:00 PM
Selection_SWSPipeVideoInspection.pdfSelection2/25/2013 3:00 PM
collapse Project : Streetcar Starter Project Appraisal Services (RFP2011-22) ‎(3)
Ad_StreetcarStarterProjectAppraisalServicesRFP2011-22.pdfAdvertisement7/11/2011 10:00 AM
Add1_StreetcarStarterProjectAppraisalServicesRFP2011-22.pdfAddendum 17/11/2011 10:00 AM
Selection_StreetcarStarterProjectAppraisalServicesRFP2011-22.pdfSelections7/11/2011 10:00 AM
collapse Project : Streetcar Starter Project Constructability Review Services (RFQ2011-93) ‎(4)
Ad_StreetcarStarterProjectConstructabilityReviewServices.pdfAdvertisement12/8/2011 5:00 PM
Add1_StreetcarStarterProjectConsrtructabilityReviewServices.pdfAddendum 112/8/2011 5:00 PM
Forms_StreetcarStarterProjectConstructabilityReviewServices.docForms A - E12/8/2011 5:00 PM
Selection_StreetcarStarterProjectConstructabilityReviewServices.pdfSelection Results12/8/2011 5:00 PM
collapse Project : Streetcar Starter Project Construction Support Services (RFQ2012-27) ‎(3)
Ad_StreetcarStarterProjConstructionSupportSvcsRFQ2012-27.pdfAdvertisement9/10/2012 5:00 PM
Forms_StreetcarStarterProjConstructionSupportSvcsRFQ2012-27.docForms9/10/2012 5:00 PM
Selection_StreetcarStarterProjConstructionSupportSvcsRFQ2012-27.pdfSelection9/10/2012 5:00 PM
collapse Project : Subsurface Utility Engineering Services (RFQ2010-20) ‎(3)
Ad-SubsurfaceUtilityEngineeringServices.pdfAdvertisement6/8/2010 5:00 PM
Add1_SubsurfaceUtilityEngineeringServices.pdfAddendum 16/8/2010 5:00 PM
Selection_SubsurfaceUtilityEngineeirngServices.pdf-Selection6/8/2010 5:00 PM
collapse Project : Treatment Facility Maintenance & Environmental Rapid Response Services - FY2011 (RFQ2010-25) ‎(10)
Ad_TreatmentFacilityMaintEnvironmentalRapidResponseFY11.pdfAdvertisement7/20/2010 2:00 PM
Add1_TreatmentFacilityMaintenanceEnvironmentalRapidResponseServicesFY2011.pdfAddendum 17/20/2010 2:00 PM
Bidders_TreatmentFacilityMaintenanceEnvironmentalRapidResponseFINAL.pdfPlan Holders of Record7/20/2010 2:00 PM
Roster_Pre_TreatmentFacilityMaintEnvironmentalRapidResponseFY11.pdfPre-Proposal Meeting Attendees7/20/2010 2:00 PM
Pre-bid Mtg Minutes.pdfPre-Proposal Meeting Minutes7/20/2010 2:00 PM
SBOP_Pre-Proposal Meeting SBOP Handout.pdfPre-Proposal Meeting SBOP Handout7/20/2010 2:00 PM
Exhibit3A_TreatmentFacilityMaintEnvironmentalRapidResponseFY11.xlsExhibit 3A - Fee Schedule: Storm Water7/20/2010 2:00 PM
Add1_Exhibit3B_TreatmentFacilityMaintSvsFY2011.xlsExhibit 3B - Fee Schedule: Engineering Services (Rev: Add1)7/20/2010 2:00 PM
Exhibits(2 4  7)_TreatmentFacilityMaintEnvironmentalRapidResponseFY11.docExhibits 2, 4 & 7 - Proposal Submittal Forms7/20/2010 2:00 PM
Award_TreatmentFacilityMaintenanceEnvironmentalRapidResponseServicesFY2011.pdfAward7/20/2010 2:00 PM
collapse Project : Tree Banding for Cankerworm Services FY10 (RFQ2009-41) ‎(2)
Ad_TreeBandingforCankerwormServicesFY10.pdfAdvertisement10/14/2009 12:00 PM
Award_TreeBandingforCankerwormServiesFY10.pdfSelection/Award10/14/2009 12:00 PM
collapse Project : Tree Banding for Cankerworms - FY2012 (RFP2011-39) ‎(2)
Ad_TreeBandforCankerworms.pdfAdvertisement8/24/2011 3:00 PM
Results_TreeBandingFY2012RFP2011-39.pdfSelection Results8/24/2011 3:00 PM
collapse Project : Tree Planting Services - FY2012 (RFP2011-62) ‎(6)
Ad_TreePlantingServicesFY2012.pdfAdvertisement11/1/2011 3:00 PM
Add1_TreePlantingServicesFY2012.pdfAddendum 111/1/2011 3:00 PM
PreProposal_TreePlantingServicesFY2012.pdfPre-Proposal11/1/2011 3:00 PM
Exhibit_ExhibitC_TreePlantingsServicesFY2012.xlsExhibit C (Spreadsheet)11/1/2011 3:00 PM
Exhibit_LandscapeConstructionStandards.pdfExhibit: Landscape Construction Standards11/1/2011 3:00 PM
Selection_TreePlantingServicesFY2012.pdfSelection Results11/1/2011 3:00 PM
collapse Project : Tree Planting Services - FY2013 (RFP2012-33) ‎(6)
Ad_TreePlantingServicesFY2013.pdfAdvertisement10/18/2012 3:00 PM
LandscapeConstructionStandards-TreePlantingServicesFY2013.pdfLandscape Construction Standards10/18/2012 3:00 PM
Pre-Bid_TreePlantingServicesFY2013.pdfPre-Bid10/18/2012 3:00 PM
SpeciesSummary_TreePlantingServices-FY2013.xlsExhibit: Species Summary10/18/2012 3:00 PM
TreePlantingServicesFY2013-ZIP Code Areas.xlsExhibit: Zip Code Areas10/18/2012 3:00 PM
Selection_TreePlantingServicesFY2013.pdfSelection Results10/18/2012 3:00 PM
collapse Project : Tree Planting Services FY11 (RFP2010-50) ‎(6)
Ad1_TreePlantingServicesFY11Advertisement.pdfAdvertisement11/30/2010 10:00 AM
Ad2_TreePlantingServicesFY11RFP2010-50.pdfRFP Document (Complete)11/30/2010 10:00 AM
Add1_TreePlantingServicesFY11.pdfAddendum 111/30/2010 10:00 AM
Exhibit_ExhibitD_TreePlantingServicesFY11.pdfExhibit D - Project Area Locations11/30/2010 10:00 AM
Exhibit_Section4_TreePlantingServicesFY11.pdfSection 4 - Proposal Section11/30/2010 10:00 AM
Award_TreePlantingServicesFY11.pdfAward11/30/2010 10:00 AM
collapse Project : Tree Pruning Arborist Services - FY2012 (RFP2011-80) ‎(4)
Ad_TreePruningArboristServicesFY2012.pdfAdvertisement12/7/2011 3:00 PM
Add1_TreePruningArboristServices-FY2012.pdfAddendum 112/7/2011 3:00 PM
Pre-Proposal_TreePruningArboristServicesFY2012.pdfPre-Proposal Meeting Attendees12/7/2011 3:00 PM
Selection_TreePruningArboristServices-FY2012.pdfSelection Results12/7/2011 3:00 PM
collapse Project : Tree Removal Arborist Services - FY2012 (RFP2011-38) ‎(3)
Ad_TreeRemovalArboristServicesFY2012.pdfAdvertisement8/23/2011 3:00 PM
Results_TreeRemovalSvsFY2012RFP2011-38.pdfSelection Results8/23/2011 3:00 PM
Award_TreeRemovalArboristServicesFY2012.pdfAward8/23/2011 3:00 PM
collapse Project : Turf Management - FY2012 (RFP2012-4) ‎(11)
Ad_TurfManagementFY2012.pdfAdvertisement3/1/2012 3:00 PM
Add1_TurfManagementFY2012.pdfAddendum 13/1/2012 3:00 PM
Pre-Proposal_TurfManagementFy2012.pdfPre-Proposal3/1/2012 3:00 PM
Exhibit1_TurfMgmtFY2012_Area1.pdfArea 13/1/2012 3:00 PM
Exhibit2_TurfMgmtFY2012_Area2.pdfArea 23/1/2012 3:00 PM
Exhibit3_TurfMgmtFY2012_Area3.pdfArea 33/1/2012 3:00 PM
Exhibit4_TurfMgmtFY2012_Area4.pdfArea 43/1/2012 3:00 PM
Exhibit5_TurfMgmtFY2012_Area5.pdfArea 53/1/2012 3:00 PM
Exhibit6_TurfMgmtFY2012_Area6.pdfArea 63/1/2012 3:00 PM
Exhibit7_TurfMgmtFY2012_Area7.pdfArea 73/1/2012 3:00 PM
Selection_TurfManagementFY2012.pdfSelection Results3/1/2012 3:00 PM
collapse Project : Unspecified Mitigation Monitoring Services and Wetland Mitigation Project Identification and Prioritization Services (RFQ2011-20) ‎(5)
Ad_Unspecifiec MitigationMonitoringandWetlandMitigationServices.pdfAdvertisement9/21/2011 5:00 PM
Add1_UnspecifiedMonitoringandWetlandMitigationServices.pdfAddendum 19/21/2011 5:00 PM
Exhibit 2A_RFQ2011-20.docExhibit 2A - Matrix9/21/2011 5:00 PM
Exhibit 2B_RFQ2011-20.docExhibit 2B - Matrix9/21/2011 5:00 PM
Selection_UnspecifiedMonitoringandWetlandMitigationServices.pdfSelection Results9/21/2011 5:00 PM
collapse Project : Unspecified Surveying Services (RFQ2010-02) ‎(3)
Ad_UnspecifiedSurveyingServices.pdfAdvertisement3/26/2010 5:00 PM
Add1_UnspecifiedSurveyingServices.pdfAddendum 13/26/2010 5:00 PM
Award_UnspecifiedSurveyingServices.pdfAward3/26/2010 5:00 PM
collapse Project : Urban Forestry Tree Inventory Services - FY2012 (RFP2012-11) ‎(4)
Ad_UrbanForestryTreeInventoryServicesFY2012.pdfAdvertisement5/24/2012 1:00 PM
Add1_UrbanForestryTreeInventoryServicesFY2012.pdfAddendum 15/24/2012 1:00 PM
PreProposal_UrbanForestryTreeInventoryServicesFY2012.pdfPre-Proposal Attendance5/24/2012 1:00 PM
Selection_UrbanForestryTreeInventoryServicesFY2012.pdfSelection Results5/24/2012 1:00 PM
collapse Project : Various Storm Water Projects (RFQ2011-12) ‎(4)
Ad_VariousStormWaterProjects.pdfAdvertisement5/25/2011 5:00 PM
Add1_VariousStormWaterProjects.pdfAddendum 15/25/2011 5:00 PM
Exhibit3_VariousStormWaterProjects.docExhibit 3: Matrix5/25/2011 5:00 PM
Selection_VariousStormWaterProjects.pdfSelection Results5/25/2011 5:00 PM
collapse Project : Various Storm Water Repair Projects (RFQ2010-49) ‎(5)
Ad_VariousStormWaterRepairProjects.pdfAdvertisement12/15/2010 5:00 PM
Add1_VariousStormWaterRepairProjects.pdfAddendum 112/15/2010 5:00 PM
Add2_VariousStormWaterRepairProjects.pdfAddendum 212/15/2010 5:00 PM
Exhibit 2_VariousStormWaterRepairProejcts.docExhibit 2 - Matrix Template12/15/2010 5:00 PM
Selection(corrected)_VariousStormWaterRepairProjects.pdfSelection Results12/15/2010 5:00 PM