Jefferson Storm Drainage Improvement Project

The Jefferson Storm Drainage Improvement Project covers 850 acres, and includes neighborhoods along Providence Road, roughly bounded to the north by Fairview Road and Sardis Road and to the west by Carmel Road.  The entire project area drains to Swan Run Branch, a tributary to McAlpine Creek. 

Numerous complaints of house, crawl space and street flooding, channel erosion, pipe failures and other problems led to the ranking of this project as a high priority project for the City.  Where needed, improvements include upgrade of street pipe systems, roadside ditches and road culverts, restoration and stabilization of stream sections, and pond improvements.   These improvements are currently expected to include over 15 major culvert upgrades, 11,000 feet of new drainage pipe, 18,000 linear feet of stream restoration/ stabilization, retrofit of up to 8 existing ponds, and inclusion of several water quality facilities.

Objectives:

Jefferson project area map.

  • Reduce street, house and crawl space flooding in the project area through flood control improvements.
  • Replace failing drainage infrastructure.
  • Resolve open Customer Service Drainage Requests in the project area.
  • Upgrade the existing storm drainage system to meet City standard.
  • Reduce ongoing channel erosion and establish natural self-maintaining streams through stream restoration and stabilization improvements.
Jefferson Project Phase Map.


Planning (Completed June 2004)
Charlotte-Mecklenburg Storm Water Services (CMSWS) worked with the engineering firm of W.K. Dickson to analyze problems and plan improvements to the drainage system in the Jefferson project area.  These plans were based on citizen calls to 704-336-RAIN, responses to the neighborhood questionnaire, field surveys, and results of the storm event models performed by W.K. Dickson.

A public meeting was held on June 10, 2003 to present the results of analysis of the existing condition of the drainage system. A second public meeting was held on March 4, 2004 to discuss the alternatives developed for improvements and obtain property owner feedback.

Map of Project Phases
In order to expedite construction, the Jefferson project was broken into 3 phases at the end of Planning. Please click here for a larger picture of the phases to this project.  You will need Adobe Reader to view this map.  Please download it free at Adobe.com.

 

View the details for each phase below:

Phase 1

Phase 2

Phase 3                                                             

An old culvert.

Project Team

William Harris, E.I.
City Project Manager
704-353-1147

Jennifer Smith, P.E.
City Program Manager
704-336-7924

A lake.

WK Dickson
Scott Sigmon,
Flood Control Improvements
919-782-0495
Scott Whalen
919-782-0495

Michael Ellison,
Streams & Water
Quality
919-782-0495

Meeting Minutes

March 17, 2005

Newsletters

November 2008 
December 2006 
July 2008                                               

An open channel.