Celia Ave. Culvert Replacement Project

The Celia Ave Culvert Replacement Project includes improvements to one Culvert under Celia Avenue and Celia Avenue drainage system.  This work will be limited to Celia Ave.

Objectives:

Cost:  $1,100,000
Please note that this figure includes all costs associated with the project such as planning and design, utility relocation, consultant fees, construction, permits and landscaping.

Celia Ave. Project Area


The Charlotte-Mecklenburg Storm Water Services (CMSWS) project team will manage the Celia Ave. Culvert Replacement Project through the phases listed below.  Specific work is conducted during each phase while an emphasis is made on public involvement throughout the entire project.

Design Phase (Currently Ongoing)
During the design phase, construction drawings for the alternative selected during the planning phase are developed.  Many details must be addressed including the determination of specific pipe sizes and alignments, channel widths and lining types, inlet sizes and locations, utility relocations, and easement locations. 

Permitting Phase (TBD)
During the permitting phase, the required water quality permits are obtained from Federal and State governments.  The permitting phase of a project typically lasts 3 to 9 months.  The permitting phase of a project may overlap other phases. 

Property Easement/Acquisition (TBD)
The City's real estate staff works with citizens and businesses to acquire Storm Drainage Easements (SDEs).  The City requests that SDEs be donated to provide access to your property to make the recommended improvements and provide future maintenance.  In addition to SDEs, temporary construction easements may be needed to access work areas.  The bid phase will begin after all easements are acquired.  The easement acquisition phase of a project typically lasts 9 months.

Bid Phase (TBD)
During the bid phase, the final plans will be circulated to qualified contractors for a competitive bidding process.  By state law, the lowest responsible bidder is awarded the construction contract.

Construction Phase (TBD)

Project Team

Troy A. Eisenberger, P.E.
City Project Manager
704-336-4835

William Harris, E.I.
City Project Manager
704-353-1147

Doug Lozner, P.E.
Watershed Area Manager
704-432-0964

Matthew Gustis, P.E.
City Engineering Team Program Manager
704-336-6183