| LOCATION/ADDRESS: |
Waverly Drive, Charlotte, NC |
| PARK DISTRICT: |
Central III |
| DESIGN CONSULTANT: |
|
| CONTRACTOR: |
|
| PROJECT HISTORY: |
Funds were re-allocated for this project from project residuals in the 2004 Park Bond Referendum. This project will provide a safe pedestrian and bike connection from this dead end street. Additionally, County Americans with Disabilities Act (ADA) funds will provide accessible paths to this neighborhood as well as the adjacent Catholic school. |
| PROJECT SCOPE: |
30ft. pedestrian bridge, 1000 l.f. of new sidewalk/trails, and benches all which will be fully accessible. |
| STATUS/TIMELINE: |
Construction began in the summer of 2008 and will be completed in Spring, 2009 |
| PARK PLANNER: |
Brian Conroy 704-336-7694 Brian.Conroy@MecklenburgCountync.gov |
|
|