Four Mile Creek Greenway, Matthews
|
Length: Approximately 2.3 miles
Location: E. John St. to S. Trade St., Squirrel Lake Park to Matthews Community Center
Description: The proposed greenway will link downtown Matthews with Squirrel Lake Park and connect neighborhoods from E. John Street to S. Trade Street. The greenway will be an asphalt trail with boardwalk. This will be the first greenway in the Town of Matthews.
4 Mile Creek Site Plan (PDF file)
What's Next:
Construction is set to begin November 2009 along Four Mile Creek proper. Additional analysis of the greenway and bridge design near the Clearbrook Rd. entrance is underway. As soon as a solution is found, construction will also begin on the connection to the Community Center and downtown Matthews. Construction duration is expected to be approximately 1 year.
Visit the FAQ Page
|
Construction Update:
The construction of Four Mile Creek Greenway is upon us. Within the next two weeks, the project contractor will be installing a primary construction entrance at the future trail access location on Rockwell View Road. Equipment will be delivered to the site and silt fence and other erosion control measures will be installed. Once these measures are in place, trail clearing and grading will begin.
|
|
For more information Contact either:
- Lee Tillery, Town of Matthews Parks, Recreation and Cultural Resource Department, Director: 704-321-7275 or email ltillery@matthewsnc.com
- Julie Clark, Mecklenburg County Park and Recreation Greenway Planning & Development, Division Director: 704-336-5927 or email Julie.Clark@MecklenburgCountyNC.gov
|
|