(Includes Charlotte ETJ)
The Charlotte Land Development Standards Manual (Revised date January 1, 2008) is a dynamic document, which is updated periodically and it is the responsibility of the user to make sure the most recent standards are being specified. To assist you, it is recommended that you select the "Notify Me" link on this page to receive appropriate notification of revisions. The current manual is available via download only from this website. Hardcopies or CDs of the Standards Manual are no longer available from the City.
NEW! JANUARY 1, 2008 REVISION PACKET - Do you currently have a hard-copy version of the CLDSM? Download a .zip file of the 46 individual detail drawings revised on January 1, 2008 for replacement in your current manual along with a revised coversheet, table of contents, and a revision log describing the changes. (Right click and Save Target As to download to your computer):
Complete Manual for Printing Purposes:
Individual Sections for on-line viewing or printing:
|
1000 |
Miscellaneous Infrastructure Standards |
|
1100 |
Street Section Details |
|
2000 |
Storm Drain Standards |
|
3000 |
Erosion Control Standards |
|
4000 |
Tree Standards |
|
5000 |
Miscellaneous Standards |
|
PDF File |
Specifications and Special Provision Notes |
|
PDF File |
CDOT Work Zone Traffic Control Notes |
|
References |
References |
Please Note: Any variations from the standard details shown herein shall be by special details shown on the project plans and are subject to approval by the City Engineer. Special details shall be conspicuously noted as such and the City of Charlotte logo and references to standard numbers shall be removed.
STORMWATER BMP STANDARDS - NEW INFO!
DRAFT detail drawings from the forthcoming 2100 Series, "STORMWATER BMP STANDARDS" are provided via the link below in AutoCad and PDF format for your use in designing stormwater BMPs in accordance with the Mecklenburg County BMP Design Manual and the North Carolina Division of Water Quality (NCDWQ) Stormwater Best Management Practices Manual. Please note these details are currently only drafts, and are not effective revisions to the CLDSM as of this time. More information will be provided as it becomes available as to the status of these standards.
|
2100 |
Stormwater BMP Standards |